Release Notes – 1/29/2024
Introduction
These are the latest release notes for CDS Visual Mentor.
Overview
This is version 2.9. This has new capabilities and bug fixes as noted below.
What's New
· Step Cycle Time
We are thrilled to introduce a significant enhancement in this release that empowers users with valuable metrics, allowing for a deeper understanding of the time it takes to complete individual steps within procedure. This provides valuable insights into the duration of each step, enabling teams to optimize processes, identify bottlenecks, and improve overall efficiency. While creating step in Studio, Author users can add the step cycle time and in Procedure’s 3D viewer, end users can view the cycle time associated with individual steps. Additionally, end users see the reverse counter which starts with duration set for that step.
View Step Cycle Time in 3D Viewer
· Integration: ETQ Training Management
We are excited to announce the new feature - the integration with ETQ Training Management system. This powerful feature brings seamless collaboration between Mentor and ETQ, providing a unified and streamlined experience for managing training processes.
With simple easy clicks create the connector and then publish procedures from Mentor to ETQ and also, track the progress in both.
Please reach out to support for any assistance on using this feature.
Bug Fixes
- Studio: Editing image with annotations was not saving changes
- Thumbnail images are now displayed on the work instruction page
Known Issue
- GLTF, and GLB file formats for importing are not loading up in Studio
- Textures and material mismatch from the original import file to Studio
Coming Soon
- Custom tools importing in Studio
Comments
0 comments
Please sign in to leave a comment.